| |
| Save Time, Save Money with Britco's Modular Core Construction© |
• •
•
|
Concurrently scheduled site preparation and factory manufacturing significantly reduces total construction time to occupancy
Overall project time savings results in construction cost savings and contributes to the bottom line with facilities open & earning revenue much sooner
Design-build capability means predictable, manageable costs from the planning stage to completion of the project with the added advantage of a single source of responsibility
|
| Controlled Construction Environment |
• • • •
|
Buildings are manufactured in a dry, enclosed factory
Efficient, assembly-line construction by skilled trades
Inspections are done at the factory during manufacturing
Systematic, in-plant monitoring & supervision with strict quality control ensures a superior quality product
|
| Factory vs Site Construction |
• • • •
|
On-site skilled trade shortages, remote location accessibility and seasonal climate changes are not a factor
Minimizes site construction noise & disruption for existing operations and neighbours
Eliminates the risk of theft and vandalism often experienced during site construction
Greatly reduces the volume of construction waste and the cost to dispose of it
|
| Superior Quality Product |
• •
• • •
|
Built to meet or exceed the same rigorous local, regional & international codes & standards as traditional site-built construction
Modules are constructed to withstand the rigors of transport and handling, often more than once, resulting in greater strength
and durability
Separate layers of the assembled modules results in double the normal soundproofing standards
Superior finishing, advanced technology and precision engineering
Award-winning designs incorporating health-related features & environmentally friendly construction techniques
|
|
The Britco Timeline: |
| |
 |
| |
Innovative designs & state-of-the-art technology
 |